au.\*:("LOVEDAY BK")
Results 1 to 4 of 4
Selection :
A MODEL FOR THE LEACHING OF NON-POROUS PARTICLESLOVEDAY BK.1975; J. S. AFR. MING METALLURGY; S. AFR.; DA. 1975; VOL. 76; NO 2; PP. 16-19; ABS. AFRIKAANS; BIBL. 1 REF.Article
A NOTE ON PREDICTING THE PERFORMANCE OF LARGE FLOTATION MACHINESLOVEDAY BK.1983; JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY; ISSN 0038-223X; ZAF; DA. 1983; VOL. 83; NO 1; PP. 20-21; BIBL. 2 REF.Article
THE INFLUENCE OF CHANGING COSTS, GRADES, AND MARKET PRICES ON AN UPGRADING OPERATIONLOVEDAY BK.1980; J. S. AFR. INST. MING METALLURGY; ZAF; DA. 1980; VOL. 80; NO 5; PP. 188-189; BIBL. 2 REF.Article
SIMULATION OF MULTICOMPONENT FLOTATION PLANTSLOVEDAY BK; MARCHANT GR.1972; J.S. AFR. INST. MING METALLURGY; S. AFR.; DA. 1972; VOL. 72; NO 11; PP. 288-294; ABS. AFRIKAANS; BIBL. 17 REF.Serial Issue